1、Alex Co makes specialist computer equipment for the space exploration industry. It recently introduced
a new product, the electroscope. This has to be assembled by hand and the process is very labour
intensive.
A budget was set for the product of 50 hours per unit, based on the time taken to make the first unit.
The first unit was produced in November Actual output and productive labour hours used for the first
six months were as follows:

The management accountant was surprised that the actual production time was below the flexed budget
every month after November. He realised that he had not taken into account the learning curve when he
set the budget.
Required:
(a) Estimate the learning rate for the period. (5 marks)
(b) Determine when the steady state was reached. (5 marks)
【正確答案】 


推薦閱讀:

1、ACCA 2020年7月考試時間安排

2、考完ACCA可以獲得哪些證書?

3、成為ACCA會員可以享受哪些福利?

4、會計ACCA的就業(yè)前景好不好?

免費試聽

  • Jessie《FR 財務(wù)報告》

    Jessie主講:《FR 財務(wù)報告》免費聽

  • 張宏遠《MA 管理會計》

    張宏遠主講:《MA 管理會計》免費聽

  • 何 文《SBL 戰(zhàn)略商業(yè)領(lǐng)袖》

    何 文主講:《SBL 戰(zhàn)略商業(yè)領(lǐng)袖》免費聽

限時免費資料

  • 近10年A考匯總

    歷年樣卷

  • 最新官方考試大綱

    考試大綱

  • 各科目專業(yè)詞匯表

    詞匯表

  • ACCA考試報考指南

    報考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串講直播

    思維導(dǎo)圖

回到頂部
折疊
網(wǎng)站地圖

Copyright © 2000 - m.galtzs.cn All Rights Reserved. 北京正保會計科技有限公司 版權(quán)所有

京B2-20200959 京ICP備20012371號-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號